Substation electrical engineering

26/may/2017 Sharing

TSK. Riobamba and Yanacocha substations. Ecuador.

$htmlUtil.escape(alt_image) Substation electrical engineering

Our company has conducted the electrical engineering at the Yanacocha and Riobamba substations, in Ecuador, for CELEC contracted by TSK.

These substations are 230/115 kV with 200 MW each.